DECK JACK | NURAJACK SELF LEVELING FLOATING DECK SUPPORTS | NZ
  • Solutions
    • TIle Decks
    • Timber Decks
    • Nuraspike
    • Accessories
    • Special Solutions
  • Gallery
    • Video Gallery
    • Picture Gallery
    • Case Studies >
      • Kumeu House
      • Castor Bay House
      • Grace Apartments
      • Vincent St Apartments
      • Craig Brothers Building
      • Waterview Home Wheelchair Ramp
  • TECHNICAL INFORMATION
    • TECHNICAL DOWNLOADS
    • FAQ's
    • Nurajack Quantity Calculator
    • Sustainability Statement
    • Webinars
  • Contact
    • Nurajack Support
    • Store Locator
    • Nurajack Installers
  • Solutions
    • TIle Decks
    • Timber Decks
    • Nuraspike
    • Accessories
    • Special Solutions
  • Gallery
    • Video Gallery
    • Picture Gallery
    • Case Studies >
      • Kumeu House
      • Castor Bay House
      • Grace Apartments
      • Vincent St Apartments
      • Craig Brothers Building
      • Waterview Home Wheelchair Ramp
  • TECHNICAL INFORMATION
    • TECHNICAL DOWNLOADS
    • FAQ's
    • Nurajack Quantity Calculator
    • Sustainability Statement
    • Webinars
  • Contact
    • Nurajack Support
    • Store Locator
    • Nurajack Installers

Craig Brothers Building

The refurbishment of the KIII building in Central Auckland involved structural strengthening and the addition of an extension to futureproof the building and make space for company growth.
​
The new addition was designed to sit on top of the existing building and set back from the parapet to provide a terrace area on the existing roof. The extension came with a unique set of challenges with regard to achieving falls, gutters and the required number of outlets. As the roof of the existing building would provide the base for the terrace, a waterproofing solution that would be compatible with deck pedestals was required. In addition, the designers looked for options to reduce the fall on the terrace roof; while a two-degree membrane roof would be NZBC-compliant, it would leave little flexibility for roof drainage between the existing building and the new solution.
​
“As we were dealing with the existing building, it was very difficult to achieve the 2 degrees required by the NZBC,” explains Architect James Craig, CraigBrothers Ltd. “We would have required two degree falls for that membrane roof, but with Nuraply 3PM we could use a one-degree fall leaving enough height for setdowns and gutters to fall to limited outlet locations.”

Picture

​For decking above the membrane, Nurajack deck pedestals were specified and installed, with pavers on top providing a level threshold to the new office floor. Previous experience with the product, along with the BRANZ appraisal for Nuraply 3PM with deck pedestals gave James confidence in the specification.
​
The final result is a clean-look paved deck that conceals a clever waterproofing and drainage solution. “I think that the secret to achieving the very challenging task successfully was the three-way conversation between the architect, contractor and Nuralite,” says James. “I feel very confident in the job that Nuralite have done.”

Office Location​
60D Leon Leicester Ave
Mt Wellington. Auckland 1060

What Our Clients Are Saying

“As you'll see we were working in an incredibly difficult area with sloping concrete paths, constantly changing substrate levels and all of it hemmed in by surrounding walls and fences. I really don't think we could have achieved the end result without the Nurajack's. Thank you for all your help with making this possible! We love it!!”
Jules - Wellington
"Our new paving on Nurajacks looks fantastic and all our friends and family cannot believe how much it has modernised the property." 
​
Shane, North Shore, Auckland.
"Great service. prompt and accurate response to enquiry. And their product (Nurajack) is cool - as an engineer I appreciate good design like this"
David Allis - Google Review

Contact Us

PRIVACY POLICY
Picture

Picture
Masterspec
Picture